Stulz Uk Ltd logo
STULZ UK LTD
First Quarter
Blenheim Road
Epsom
Surrey
KT19 9QN

Hybrid Cooling Systems

For further information contact:
Johnathan Attwood / Martina Burger
martina.burger@stulz.co.uk
01372 749666
07973 511118 www.stulz.co.uk

Course approved by

CIBSE logo

Length
One Hour

Attendees
Contracts engineers, Projects Engineers, Consultants, Planners, Facilities Manager, Building Services Engineers, as well as Industry professionals.

Fee
FOC

Location
At the participants own premises, or at Stulz UK office in Epsom, Surrey

Provider
STULZ UK LTD

Description
Introduction • What makes up a hybrid water cooling system? • How does a hybrid water cooling system work? • Free cooling Calculations that must be done when sizing any hybrid water system • How to size the pump(s) • How to size the pipework • How to calculate airflow requirements External equipment • Dry coolers • What type of Pumps should I use? • Rack Enclosures Where can I save if I use a hybrid system? • How to calculate power consumption and what does it mean to you • EER • PUE What have we learned/conclusion • Where is the best place to use a hybrid water cooling system? • Future of CRACs

Course title and key points covered
• What makes up a hybrid water cooling system? • Free cooling • Where can I save if I use a hybrid system? • How to calculate power consumption and what does it mean to you • Where is the best place to use a hybrid water cooling system?

Speakers
Johnathan Attwood MA, BSc (hons) – Applications Engineer Stulz sales representative Keith Norton – Senior technical sales manager Paul Fletcher – Sales manager Phil McEneaney – Senior technical sales manager