ENERGY: Sustainability; Optimisation & Environment

Air Conditioning & Refrigeration

Automatic thermostatic balancing, system pasteurisation and Legionella control of DHW secondary circulation systems.

Oventrop Uk Ltd logo
OVENTROP UK LTD
Hatch Industrial Park
Greywell Road
Hatch
Basingstoke
RG24 7NG
www.oventrop.co.uk

For further information contact:

Course approved by

CIBSE logo

Length
1 to 1 ½ Hours

Attendees
i.e Specifying engineers; architects;contractors, commissioning engineers

Fee
None for one hour courses

Location
Usually at client offices or our training department

Provider
Oventrop UK Ltd

Description
The seminar will focus on providing total system design solutions in DHW secondary circulation systems. The seminar will discuss how to ensure that DHW secondary circulation return water temperatures are achieved and maintained above 55 degrees providing a thermal balance on the system and also ensuring good day to day legionella control. Also to be discussed is how the system maintains a dynamic balance and control during general operation of the system. The seminar will then discuss how the user can introduce elevated DHW temperatures to achieve automatic system pasteurisation and enhanced legionella control.

Course title and key points covered
Automatic thermostatic balancing, system pasteurisation and Legionella control of DHW secondary circulation systems.

1. Automatic thermal balancing of DHW secondary circulation systems

2. Correct application of commissioning products

3. Legionella control

4. Automatic system pasteurisation

5. Cost savings by commissioning reduction

Speakers
Chris Doherty, National Specifications Manager, Oventrop UK Ltd. He has been working in the industry for 27 years working on the tools as an installer and also in design offices. For the last 11 years He has worked at Oventrop Uk Ltd, firstly as an Area Sales Manager and now as National Specifications Manager. Chris has knowledge and experience in assisting design, installation and commissioning on various large scale projects within the HVAC Industry

Air Distribution & Ventilation

Controls & Instrumentation

Heating

Pipework/ Valves/ Pumps, etc.

Building Management / Legislation / Regulation

System Design & Project Management

Electrical Services

  • No CPDs

Public Health

CPDs - Automatic thermostatic balancing, system pasteurisation and Legionella control of DHW secondary circulation systems.