For further information contact:
Length
The presentation contributes 1 hour to the annual CPD requirement
Fee
none
Location
Client's offices or our training facilities in Elstree, Herts
Provider
FUJITSU GENERAL AIR CONDITIONING (UK) LTD
Description
· Create an comfortable environment for the occupants within internal spaces
· Monitor system performance to ensure the reliability, safety and efficiency of the plant
· Reduce power for lower running costs and CO2 emissions
· Control the use of external air to provide free cooling
· Integrating existing control systems
· Control both heating and cooling to prevent simultaneous operation
· Monitor space occupancy to prevent systems operating unnecessarily
· Provided detailed feedback to establish correct maintenance schedules
Course title and key points covered
HVAC Controls are key for Comfort, Efficiency and Reliability.
· Energy Efficiency
· Comfort and ease of use
· Integration
· Planned and preventable maintenance
· Installation methods
· Remote monitoring and control
Speakers